Renting a dedicated GPU cluster takes seven decisions, a handful of quotes and a short test before you sign. This guide walks an AI team through each step, from writing down the requirement to running the first job.

Step 1: Define the requirement

Operators quote faster, and closer to what you need, when the request answers these seven points up front. Where you have room, say so: being flexible on start date or location usually brings more offers.

DecisionTypical optionsHow to decide
GPU modelH100, H200, B200Memory your model needs, and budget (Step 2)
Number of GPUsIn nodes of 8Training speed you need; leave room to scale
InterconnectInfiniBand, RoCE, noneRequired if one job runs across several nodes
StorageShared file system, object storage, local disksSize of your datasets and checkpoints
LocationCountry or region; data residency rulesWhere your data is allowed to sit, and latency
Start dateNow, or a dateCapacity available today often costs more
TermWeeks to yearsHow long the project runs, and whether you may extend

Add how you want the cluster delivered (bare metal, virtual machines, or managed Slurm or Kubernetes) and the support you need. That is the whole brief: one page is enough.

Step 2: Pick the GPU

Start from memory: the GPU must hold your model, its activations and, for inference, the context you serve. Then weigh price and availability. H100 is the oldest and the cheapest of the three per GPU-hour; H200 is the same Hopper generation with far more memory; B200 is the newest and fastest.

GPUMemory per GPUMemory bandwidthGood fit
H100 SXM80 GB HBM33.35 TB/sFine-tuning and training; mature software
H200141 GB HBM3e4.8 TB/sLarger models and long-context inference, same architecture as H100
B200 (HGX)180 GB HBM3e7.7 TB/sLargest models and highest throughput, at a higher hourly price

All three come in nodes of 8 GPUs linked by NVLink inside the node. Ask for SXM versions for training: PCIe variants are cheaper but slower, and they are priced differently.

Step 3: Choose how you buy

For a project of more than a few weeks on 8 GPUs or more, a dedicated term contract is usually the right tool: you lock in the hardware, the network and the price for the whole project.

ModeCommitmentPriceAvailabilityBest for
On-demandNone; pay by the hourHighest rate per GPU-hourNot guaranteed; can sell outTests, short bursts, a single node
Reserved on a platformWeeks to months on the provider's cloudLower than on-demandGuaranteed for the periodSteady workloads that fit the provider's standard setup
Dedicated term clusterMonths or more, by contractNegotiatedSpecific nodes reserved for youTraining runs and multi-node jobs that need a fixed, interconnected cluster

On-demand capacity can disappear when the market is tight: in April 2026, SemiAnalysis reported on-demand capacity sold out across GPU types. A term contract removes that risk for the length of your project.

Step 4: Set a budget

The budget is GPUs × hours × price per GPU-hour, plus whatever the headline price leaves out.

Worked example (illustrative price): 32 H100 GPUs for three months at 730 hours a month is 70,080 GPU-hours. At $2.50 per GPU-hour, that is about $175,000 for the compute alone.

Then add what a headline price may not include: shared storage, data egress, support, any set-up fee, and the cost of a deposit or prepayment if the provider asks for one. Prices move, so a fixed price for the whole term is worth asking for. To turn a quote into its real cost, use the GPU cost calculator.

Step 5: From request to running cluster

When the capacity already exists in a data centre, plan for a few weeks from brief to first job. Capacity that still has to be built takes months.

  1. Write the brief: the seven points of Step 1, on one page.
  2. Collect quotes: ask several operators for written offers on the same brief, with a validity date.
  3. Compare and negotiate: put the offers side by side, all-in, and negotiate price, start date and terms.
  4. Clear the paperwork: company checks on both sides, credit review, deposit if required.
  5. Test the cluster: run your own benchmarks on the nodes you will actually receive.
  6. Sign and go live: the service agreement is signed and the cluster is handed over.

The usual source of delay is step 2: an incomplete brief means operators come back with questions instead of prices.

Step 6: Get it in writing

A good offer answers these questions on paper before you sign. Use this list with every operator, so their answers line up.

  • A written offer, valid until a stated date
  • One all-in price, or every extra charge listed with its rate
  • The hours billed each month, stated explicitly
  • The exact hardware: GPU model, node specification, network, storage
  • The data-centre location
  • The delivery date for the full cluster
  • The uptime commitment, and the credit if it is missed
  • A test period on the actual nodes before signature
  • Payment terms, deposit, and the options to extend or end early

Working with a broker

Operators' sales teams sell directly, and every contract is signed bilaterally. That leaves a buyer two options: sign with a single counterparty without knowing whether the price is fair, or run steps 2 to 5 alone, which takes time. A broker is the third option.

Compute Group takes your brief, asks several operators for firm written offers and shows them side by side, on the same basis. You choose, and we introduce you to the operator, with whom you sign directly. It is free for buyers: the operator pays our fee when a deal completes. Operators see your requirement without your name until you choose an offer.

Sources

Next steps

Check a quote with the GPU cost calculator, or submit a requirement and we ask operators for firm offers, shown side by side. Free for buyers.

Also read: How to compare GPU cloud quotes on the same basis